HYDESIGN — Hydraulic Engineering Tools
CLOUD WORKSPACEChecking account…← Calculators
SHARED WORKSPACE · LIVE CLOUD AUTO-SAVE

Engineering Workbench

Move from application requirements to preliminary sizing, a component list and a review-ready design record.

PROJECT STATUSWORKING DRAFTNot saved yet
DESIGN PRESSURE160 barinput basis
REQUIRED FLOW80 L/mincalculated / entered
HYDRAULIC POWER21.3 kWtheoretical
BOM LINE ITEMS0No cost entered
01 / DESIGN BASIS

Define the application

01

Start with operating conditions. The sizing module calculates a first-pass cylinder, flow and pump duty point.

ENGINEERING CHECKLIST

Project readiness

Checklist items are a workflow aid, not an engineering approval.

WORKFLOW

From requirements to release

1SizeForce, speed, flow, power and line sizing
2SelectBuild the preliminary component BOM
3ReviewInspect a conceptual hydraulic circuit
4DocumentExport project record and BOM
DESIGN NOTE

Engineering assumptions

  • Metric inputs with bar, mm, L/min and kW outputs.
  • Hydraulic power is theoretical; motor sizing accounts for efficiency and margin.
  • Line sizing is a velocity-based first pass; pressure loss and transients require separate verification.
  • Component families are candidate references, not confirmed material-number configurations.
ENGINEERING CALCULATORS

System sizing

Change inputs and calculate a preliminary duty point. Results feed the project overview.

Metric · SI
ACTUATOR

Cylinder sizing

↔
Extension force—kN
Retraction force—kN
Extension flow—L/min · total
Retraction flow—L/min · total
Extension speed—mm/s
Oil volume / stroke—L · cap end

Enter actual load, mounting and duty requirements before selecting a cylinder.

POWER UNIT

Pump & motor sizing

◉
Displacement required—cc/rev
Hydraulic power—kW
Input power estimate—kW
Motor with margin—kW

Verify pressure at required flow, peak duty, control type, speed limits, and drive compatibility.

PIPEWORK

Pipe internal diameter

⇢
Required ID—mm · minimum
Velocity at selected ID—m/s
Velocity check—against target

Formula: ID = √(4Q / πv). Check standard sizes, wall thickness, pressure rating, fittings and line losses separately.

SIGNAL CONDITIONING

4–20 mA scaling

⌁
Scaled output— mALinear scaling, 4 mA at LRV and 20 mA at URV.
PROCUREMENT PREPARATION

Components & bill of materials

Maintain a preliminary component list, quantities, technical notes and budgetary prices.

LINE ITEMS0
TOTAL QUANTITY0
BUDGETARY TOTAL₹0.00
STATUSPRELIMINARY
Prices are user-entered estimates, not live quotations.
ItemTypeManufacturer / seriesKey specificationQtyUnit price (₹)Total (₹)
No components added. Add your first component to build the preliminary BOM.
FUNCTIONAL CONCEPT

Hydraulic circuit concept

High-level functional overview for discussion. Not a standards-compliant schematic or validated circuit design.

CONCEPT ONLY
Basic single-actuator systemReservoir · pump · relief valve · directional valve · cylinder · return filtration
TANKPUMPDIRECTIONALVALVERELIEFCYLINDERFILTERSUCTIONPRESSUREA / B WORK PORTSRETURNFUNCTIONAL CONCEPT ONLY · VERIFY PORTS, CONTROL LOGIC, LOAD HOLDING AND SAFETY DEVICES
Pressure / work line Return path Concept / control line

Design review prompts

Checklist state is saved with the project on this browser.

TECHNICAL HANDOVER

Documentation & release

Generate a project summary, sizing record and preliminary BOM for review.

PROJECT DOSSIER

Included in report

  • Project metadata, revision and design basis
  • Cylinder sizing outputs and assumptions
  • Pump displacement, hydraulic power and motor power estimate
  • Pipe diameter and velocity check
  • Preliminary BOM, quantities and budgetary subtotal
  • Engineering assumptions, open checks and safety disclaimer
EXPORTS

Download project artifacts

PDF is produced through the browser print dialog. CAD formats and OEM-specific material numbers are not generated unless a verified source/configuration is available.

HYDESIGN — Hydraulic Engineering ToolsPRELIMINARY

New Hydraulic System

Project report preview updates from the current project data.

MARKET DATA · NSE INDIA

NSE Live Option Chain

Open the official NSE option-chain page from inside HYDESIGN. The NSE page controls its own live refresh, symbols, expiries, streaming settings and market data.

Open official live option chain ↗
Official NSE pageIf the live table below is blocked or does not load, use “Open official live option chain”. NSE may restrict displaying its site inside another website.

Live market data is supplied and governed by NSE. HYDESIGN does not scrape, copy, or independently redistribute NSE data. For a native live-data dashboard, obtain an appropriate NSE Data & Analytics subscription/API and display rights.

Built on Hatchable